Lease Your Land for Solar: Does It Have Grid Capacity?
Check your eligibility for a Solar Farm or Battery Storage site in 30 seconds. Identify viable grid connection points (33kV+) near you.
Grid Capacity Assessment Tool
Approximate is fine. Solar farms need 10+ acres; smaller plots near the grid can still suit battery storage.
Free assessment using open data from all six GB distribution network operators.
How much do solar farms pay per acre?
2026 UK lease rates, how RPI indexation compounds, worked income examples for 5, 25 and 100 acre sites, and the grid connection check that decides if any of it applies to your land.
What the Tool Estimates
The check returns an indicative annual lease estimate for your postcode. Solar typically £850-£1,200/acre; battery storage £10,000+/acre when grid connection is good.
Grid Connection Distance
Land within 2.5 miles of a primary substation is highly valuable. Our tool checks your distance instantly.
No Obligation Search
We use open infrastructure data to provide a preliminary assessment. You only proceed if the numbers work.
How the Grid Check Estimates Your Income
The tool weights your estimate against two bands based on substation distance, voltage, and site size:
Higher Band (£1,100-£1,200/acre)
- • Within 1 mile of a 33kV+ substation
- • Sites over 100 acres
- • South-facing, flat land
- • Grade 3b or lower agricultural land
Standard Band (£850-£1,100/acre)
- • 1-2.5 miles from substation
- • Sites 30-100 acres
- • Moderate topography
- • May require grid reinforcement
Estimates assume annual RPI-linked increases across a 25-40 year lease. For the full breakdown of regional variation, worked income examples by acreage, and inflation-linking math, see our Solar Farm Income & Profit Per Acre UK guide.
How SolarGridCheck Works
- Locate Infrastructure: We cross-reference your postcode with NESO (National Energy System Operator) and DNO datasets.
- Analyze Viability: We calculate cable distance and voltage capacity to estimate connection costs. Most viable sites then need a DNO connection (G99) approval from your local network operator.
- Connect with Developers: If viable, we match you with funded developers looking for sites in your county.
Live Market Data
*Market averages Q4 2025. Actual offers depend on grid connection cost.
What if my land isn't right for solar?
Don't write off your asset. Explore high-value alternatives.
Battery Storage (BESS)
High Lease RatesToo small for a solar farm? Battery storage projects only require 1-2 acres of land but need high grid capacity.
Check Battery Potential →Biodiversity (BNG)
New MarketLand quality too poor for farming or solar? Sell Biodiversity Net Gain units to developers.
Calculate BNG Value →